Monday, June 20, 2011

Electrical and Air-conditioner

The electricians are currently wiring the house, Will take some photos once they are finished.  I am going to take photos of all wiring for future reference.

The cooling specialists are currently installing the air-conditioner.

Over the weekend, it appears that someone has attempted to steal the glass stacker door some time between Saturday afternoon and Sunday afternoon.  It was held in place by wedged timber from inside the house, there is no way the wind knocked the door down. If we had not had tradesmen working this week I believe it would be gone.


This is about the tenth item to go missing.  We had floor trusts, lentils, timber, roof tiles and our water meter go missing since the house was started.