We went past the house and some more work has been done.

The garage doors have been installed, looks good.


The termite protection has been installed around the house perimeter except for the garage which is on the land boundary. I need to confirm if this is a problem.

Someone has moved the termite barrier to fix the problem with the slab being too short in some areas.  They have used an industrial grout to fix the problem and now the termite protection needs to be redone.

It's interesting the order things get completed. The slab being short was identified at our last independent inspection, months ago.  Now the termite protection has to redone because it was not addressed earlier in  the building process.