Tuesday, March 8, 2011

Structural Changes

We have made a couple changes to the design of the Cremorne, firstly we added an additional walk in robe (dressing room) for the wife. Added a shower to the powder room, added an additional door the to garage (from pantry), rain water toilet flushing and extended the length of the garage.

Ground Floor plan
First Floor plan


Next is the Colour and Electrical appointments. I have been told that you generally spend $5000.00 on extra's even though the initial allocation from tender is only $1200.00. This will be interesting.