Sunday, November 13, 2011

House - thieving continues

We passed the house this afternoon and guess what, we have had our external lights stolen.



The house on Saturday.


The house on Sunday - after lights were stolen.




The security (sensor) light on the side of the house


The container used to reach the sensor light.

Wednesday, November 9, 2011

House - Near completion

We went past the house and some more work has been done.

The garage doors have been installed, looks good.


The termite protection has been installed around the house perimeter except for the garage which is on the land boundary. I need to confirm if this is a problem.

Someone has moved the termite barrier to fix the problem with the slab being too short in some areas.  They have used an industrial grout to fix the problem and now the termite protection needs to be redone.

It's interesting the order things get completed. The slab being short was identified at our last independent inspection, months ago.  Now the termite protection has to redone because it was not addressed earlier in  the building process.

The range hood has also been installed.

Wednesday, November 2, 2011

House Update

Not much to report, the house is moving slowly.

The tiling has been finished,  mirrors have been fitted, site has been cleared.


Bathroom, the mirror look great.


Kitchen, RedBox splash back.



Powder room, this mirror goes to the ceiling. Its huge!


The site has been scrapped. 
The block behind us has started to build, just as we are finishing the process.

Thursday, September 29, 2011

Painting - Photo's


Kitchen looking towards the front door

Kitchen


Family Room
 

Games Room

Doors from Kitchen facing Alfresco

Tuesday, September 27, 2011

Painting Completed

Spoke to the painters last Friday and they told us the painting was complete, so arranged a site visit, which we had yesterday.

The painting is interesting, we were told that you can only look at the walls at a 90 degree angle.

If you look at any other angle the painting does not appear consistent, but at the correct angle the paint looks great.  The doors have such a great shine, as do the door/window trims.

Next is the electrician, plumber and then the tiler.

The painter needs to come back and complete the garage once the plasters have finish.

Still waiting on the carpenters to come back and fix the garage as well as the brick layer who needs to replace some brickwork (bricks to short) around the doors.

Will upload some photo's when I get a chance.

Thursday, September 15, 2011

Painting

Had a site visit this morning, the painters were on site doing preparation work.  All the plastering had been finished (garage and stairs).

At this stage of the building process the house appears to have slowed down, not sure it actually has, but is seems to take forever to get the house finished.

Two weeks (starting now) for the painter, then tilers followed by electrical and plumbing.

We are currently six weeks behind schedule, the house should be completed by the first week of Oct,  currently looking at mid to end of Nov.

Its a slow slow slow process............

Friday, September 2, 2011

Fix stage completed.

Had a meeting with the SS on Thursday, did a walk though of the home.  It is looking great. The fixing stage was almost completed, skirting missing from a couple of the rooms and was finished today.

Had a small water problem in the ensuite, the cleaner (cleaning the portable toilet) turned on the water and one of the taps in the ensuite was missing a plug and water went everywhere. Some of the plaster on the rumpus room now needs to be fixed. Not sure how the water got to the rumpus room. SS is going to wait until the water has dried out and then identify what has been damaged by the water.




Water everywhere in the ensuite


Water leaking into the games room.


Kitchen, one of the carpenters fitting a door.


Laundry.

Powder room.


Stairs, needs a frame and plaster.